khanbrotherstransportmumbai@gmail.com
Follow us:

Join to our group

Join to our group

Completed Projects

Sr No Project Name Project Value Client Type of Project Completed Year
1 Navi Mumbai International Airport – Boulder Shifting ₹120 cr Essnes Construction & Consultancy Pvt Ltd Loading & Transportation of Boulder 2023
2 Hiring of HEMM for Removal & Transportation of 1653.00 L.Cum of OB and 196.00 L.Cum of Re-handling of OB by outsourcing for project Nakrakonda-Kumardih “B” OCP (3.0 MTY) under Bankola Area ₹1786 cr BGM & M-RPL-JMCT OB Project with Coal Handling 2025
3 Unloading of Pond Ash ₹108 cr Meja Urja Nigam Pvt Ltd Fly Ash Transportation 2024
4 Unloading of Pond Ash ₹23.85 cr Vindnagar Super Thermal Power Plant Fly Ash Transportation 2025
5 Hiring of HEMMs (Shovels, Dumpers/Tippers, Drills, Dozers, Motor Grader, Water Sprinkling, Diesel Bowser, etc.) for excavation and transportation of coal from quarry face to surface coal stock yard/CHP via weighbridge at IBOCM, incl. drilling, excavation, loading, transportation, dumping, dozing, grading, water sprinkling ₹296 cr EMTA Coal Mines, Chandrapur, Maharashtra Coal Handling 2024
6 Single & Double Phase Meter installation ₹20 cr Live Project Pvt Ltd Smart Meter 2025
7 Completion of pending construction/development works of Towers T-3 & T-4 and non-tower area (incl. common areas and basement dewatering if required) ₹74 cr Morphes Bluebell Pvt Ltd Building Project 2024
8 Earth Work – Washim, Maharashtra ₹8 cr Shree Mahalaxmi Buildcon Highway Earthwork 2024
9 Transportation from NTPC Bindh Nagar Singrauli to Rewa Roodh NHAI Jabalpur (MoRTH Project) under NTPC Limited, Vindhyachal ₹43 cr Hiltop Hirise Fly Ash Transportation in Shilpara Bypass 2024
10 Construction of Beli Bridge, Phaphamau, Allahabad ₹18.5 cr Aar Rudramm Infra Projects Pvt Ltd Fly Ash Transportation 2022
11 Works at POST Gandhinagar, Main Road Pradhanpur, Lathudih, Ghazipur (UP): Construction of Four-Lane Highway (Greenfield) section of N-31, Package-1 (Hridaipur km 0.00 to Shahpur km 42.50) – Earthwork Ch. 9+000 to 19+000 ₹32 cr Ravi Infrabuild Pvt Ltd Earthwork – 4-Lane Highway (Ghazipur, UP) 2023
12 Development of New Greenfield Airport at Dholera, Ahmedabad (Gujarat) Phase-1 – Detailed Designing, Engineering, Procurement & Construction of operational area infrastructure (Runway, Taxiway, Apron, Perimeter Road, etc.) incl. associated Electrical works ₹25 cr Varha Infra Ltd Airport Earthwork 2024
13 4-Lane Highway Bareilly to Sitarganj – Package-1 ₹32 cr Raj Corporation Ltd NH-74 – Earth Work 2025
14 4-Lane Highway Bareilly to Sitarganj – Package-2 ₹18 cr Raj Corporation Ltd NH-74 – WMM/GSB Sub-grade 2025

Navi Mumbai International Airport – Boulder Shifting

Project Description

With accuracy and efficiency, KhanBrothers Infra Projects Pvt Ltd completed the Boulder Shifting project for Navi Mumbai International Airport. In order to guarantee timely completion while upholding safety and environmental standards, the project required sophisticated procedures and expert labor. This accomplishment demonstrates our capacity to manage difficult problems and helps to build top-notch infrastructure.

Project Value
₹120 cr
Client
Essnes Construction & Consultancy Pvt Ltd
Type of Project
Loading & Transportation of Boulder
Completed Year
2023

Hiring of HEMM for Removal & Transportation of 1653.00 L.Cum of OB and 196.00 L.Cum of Re-handling of OB by outsourcing for project Nakrakonda-Kumardih “B” OCP (3.0 MTY) under Bankola Area

Project Description

For the removal and transportation of 1653.00 L.Cum of OB and 196.00 L.Cum of re-handling of OB in Nakrakonda-Kumardih ‘B’ OCP (3.0 MTY) under Bankola Area, KhanBrothers Infra Projects Pvt Ltd successfully hired HEMM. The project demonstrated our proficiency in large-scale mining operations and was finished safely, effectively, and on schedule.

Project Value
₹1786 cr
Client
BGM & M-RPL-JMCT
Type of Project
OB Project with Coal Handling
Completed Year
2025

Unloading of Pond Ash

Project Description

With accuracy, efficiency, and safety, KhanBrothers Infra Projects Pvt Ltd successfully finished the Pond Ash Unloading project. The project was completed without a hitch while maintaining environmental sustainability thanks to the use of cutting-edge machinery and knowledgeable labor. Our staff's commitment to on-time delivery and high-quality work demonstrates our proficiency in material handling and infrastructure assistance for industrial expansion.

Project Value
₹108 cr
Client
Meja Urja Nigam Pvt Ltd
Type of Project
Fly Ash Transportation
Completed Year
2024

Unloading of Pond Ash

Project Description

With accuracy, efficiency, and safety, KhanBrothers Infra Projects Pvt Ltd successfully finished the Pond Ash Unloading project. In order to meet industrial needs and have as little of an impact on the environment as possible, the project concentrated on sustainable handling and transportation. Our dedication to excellence and dependability in providing infrastructure solutions that support long-term development is demonstrated by our timely execution, cutting-edge techniques, and stringent quality standards.

Project Value
₹23.85 cr
Client
Vindnagar Super Thermal Power Plant
Type of Project
Fly Ash Transportation
Completed Year
2025

Hiring of HEMMs (Shovels, Dumpers/Tippers, Drills, Dozers, Motor Grader, Water Sprinkling, Diesel Bowser, etc.) for excavation and transportation of coal from quarry face to surface coal stock yard/CHP via weighbridge at IBOCM, incl. drilling, excavation, loading, transportation, dumping, dozing, grading, water sprinkling

Project Description

Shovels, dumpers, drills, dozers, graders, and other support equipment for coal excavation and transportation were successfully hired by KhanBrothers Infra Projects Pvt Ltd for IBOCM. In order to ensure smooth operations, safety, and timely completion, the project involved efficient drilling, loading, hauling, dozing, grading, and water sprinkling. It also produced high productivity and supported sustainable coal handling methods.

Project Value
₹296 cr
Client
EMTA Coal Mines, Chandrapur, Maharashtra
Type of Project
Coal Handling
Completed Year
2024

Single & Double Phase Meter installation

Project Description

With accuracy and efficiency, KhanBrothers Infra Projects Pvt Ltd successfully finished the Single & Double Phase Meter Installation project. Improved distribution systems, better energy monitoring, and dependable electrical connections were all made possible by the project. When finished on schedule, it demonstrates our dedication to quality, safety, and customer satisfaction while supporting the region's sustainable growth and more robust electrical infrastructure.

Project Value
₹20 cr
Client
Live Project Pvt Ltd
Type of Project
Smart Meter
Completed Year
2025

Completion of pending construction/development works of Towers T-3 & T-4 and non-tower area (incl. common areas and basement dewatering if required)

Project Description

Towers T-3 and T-4, as well as non-tower regions, have had their outstanding construction and development work successfully finished by KhanBrothers Infra Projects Pvt Ltd. Common areas were completed, and if necessary, the basement was dewatered. This accomplishment, which was carried out with accuracy, quality, and safety requirements in mind, demonstrates our dedication to on-time delivery and the development of sustainable, contemporary living infrastructure.

Project Value
₹74 cr
Client
Morphes Bluebell Pvt Ltd
Type of Project
Building Project
Completed Year
2024

Earth Work – Washim, Maharashtra

Project Description

With their effective completion of the Earth Work project in Washim, Maharashtra, KhanBrothers Infra Projects Pvt Ltd demonstrated their proficiency in extensive excavation and land development. With a strong emphasis on safety, quality, and environmental responsibility, the project was completed on schedule with the help of sophisticated machinery and highly qualified labor, establishing a strong basis for future infrastructure and regional growth.

Project Value
₹8 cr
Client
Shree Mahalaxmi Buildcon
Type of Project
Highway Earthwork
Completed Year
2024

Transportation from NTPC Bindh Nagar Singrauli to Rewa Roodh NHAI Jabalpur (MoRTH Project) under NTPC Limited, Vindhyachal

Project Description

The transportation project under NTPC Limited, Vindhyachal, from NTPC Bindh Nagar Singrauli to Rewa Roodh NHAI Jabalpur was successfully finished by KhanBrothers Infra Projects Pvt Ltd. This MoRTH project demonstrated our timely execution, safe material handling, and logistical efficiency. The initiative demonstrates our dedication to fostering the expansion of the nation's infrastructure by providing dependable, environmentally friendly, and superior transportation options.

Project Value
₹43 cr
Client
Hiltop Hirise
Type of Project
Fly Ash Transportation in Shilpara Bypass
Completed Year
2024

Construction of Beli Bridge, Phaphamau, Allahabad

Project Description

By successfully completing the construction of the famous Beli Bridge in Phaphamau, Allahabad, KhanBrothers Infra Projects Pvt Ltd improved regional connections and made traffic easier. The bridge's construction guarantees safety, longevity, and seamless mobility thanks to its cutting-edge engineering and stringent quality requirements. This accomplishment demonstrates our dedication to completing historic infrastructure projects that promote long-term economic prosperity and community development.

Project Value
₹18.5 cr
Client
Aar Rudramm Infra Projects Pvt Ltd
Type of Project
Fly Ash Transportation
Completed Year
2022

Works at POST Gandhinagar, Main Road Pradhanpur, Lathudih, Ghazipur (UP): Construction of Four-Lane Highway (Greenfield) section of N-31, Package-1 (Hridaipur km 0.00 to Shahpur km 42.50) – Earthwork Ch. 9+000 to 19+000

Project Description

The construction of the four-lane highway (greenfield) segment of N-31, Package-1, from Hridaipur km 0.00 to Shahpur km 42.50 was successfully finished by KhanBrothers Infra Projects Pvt Ltd. This project, which covered earthwork from Ch. 9+000 to Ch. 19+000, improved road connectivity, shortened travel times, and fortified regional infrastructure—all of which demonstrated our dedication to timely, high-quality, and safe delivery.

Project Value
₹32 cr
Client
Ravi Infrabuild Pvt Ltd
Type of Project
Earthwork – 4-Lane Highway (Ghazipur, UP)
Completed Year
2023

Development of New Greenfield Airport at Dholera, Ahmedabad (Gujarat) Phase-1 – Detailed Designing, Engineering, Procurement & Construction of operational area infrastructure (Runway, Taxiway, Apron, Perimeter Road, etc.) incl. associated Electrical works

Project Description

With the complete completion of Phase 1 of the New Greenfield Airport in Dholera, Ahmedabad, KhanBrothers Infra Projects Pvt Ltd delivered top-notch infrastructure. Detailed planning, engineering, purchasing, and building of the runway, taxiway, apron, perimeter road, and related electrical work were all part of the project. With accuracy, security, and effectiveness, we helped create a contemporary aviation center that bolstered regional and national development.

Project Value
₹25 cr
Client
Varha Infra Ltd
Type of Project
Airport Earthwork
Completed Year
2024

4-Lane Highway Bareilly to Sitarganj – Package-1

Project Description

The 4-Lane Highway Bareilly to Sitarganj – Package-1 was successfully finished by KhanBrothers Infra Projects Pvt Ltd, improving regional connection and transportation effectiveness. This historic initiative guarantees safer road infrastructure, less traffic, and more comfortable travel. The highway is essential for increasing trade, mobility, and sustainable regional development since it is built with cutting-edge engineering, high quality standards, and on-time delivery.

Project Value
₹32 cr
Client
Raj Corporation Ltd
Type of Project
NH-74 – Earth Work
Completed Year
2025

4-Lane Highway Bareilly to Sitarganj – Package-2

Project Description

The 4-Lane Highway from Bareilly to Sitarganj – Package-2 was successfully finished by KhanBrothers Infra Projects Pvt Ltd, improving regional connectivity and transportation effectiveness. Improved commercial movement, shorter travel times, and smoother traffic flow are all guaranteed by this contemporary highway project. It is a significant piece of infrastructure development that supports regional growth and advancement and was finished with accuracy, quality, and safety.

Project Value
₹18 cr
Client
Raj Corporation Ltd
Type of Project
NH-74 – WMM/GSB Sub-grade
Completed Year
2025